August 26, 2005
|
|
|
|
August 26, 2005
|
|
|
|
September 8, 2005
|
|
|
|
September 20, 2005
|
|
|
|
September 21, 2005
|
|
|
|
|
September 29, 2005
|
|
|
|
September 29, 2005
|
|
|
|
January 13, 2006
Level PT Slab
|
|
|
|
January 13, 2006
Pouring Level 1 Post-Tensioned Slab
|
|
|
|
January 14, 2006
Forming Level 2 Walls
|
|
|
|
|
January 19, 2006
Cutting Tensioned Cables
|
|
|
|
January 20, 2006
Installing Storm Pipes Below Building
|
|
|
|
January 26, 2006
Forming Walls Betwen New and Existing Structures
|
|
|
|
February 6, 2006
Backfilling Basement Walls
|
|
|
|
February 6, 2006
Forming Grade Beam
|
|
|
|
|
February 13, 2006
Progress Photo from 37th Street
|
|
|
|
February 16, 2006
Demo of Concrete Landing at Existing Building
|
|
|
|
February 16, 2006
Forming Level 1 Columns
|
|
|
|
February 16, 2006
Demo and Excavation in 37th Street for New Manhole
|
|
|
|
February 16, 2006
Pouring Level 1 Slab on Grade
|
|
|
|
|
March 10, 2006
Forming the Roof Deck
|
|
|
|
March 22, 2006
Lines of New and Existing Roofs
|
|
|
|
March 22, 2006
Topped Out Structure from 37th Street
|
|
|